A bathroom remodel starts behind the surface. We open the wet wall, check for damage, and rebuild it with a proper waterproof layer around the tub or shower. We size the exhaust fan so moisture leaves the room. Before demolition, we also decide with you whether the existing fixtures stay or go, since that choice shapes the plumbing, the layout, and the budget.
Most bathroom trouble starts out of sight. You may see grout that crumbles, caulk that keeps turning black, or a ceiling spot that grows after every shower. A vanity floor that feels spongy points to hidden moisture. So does a mirror that fogs for an hour. Spot fixes rarely last once water has reached the framing. We open the area, find the source, and rebuild it so the room stays dry.
We remove the old finishes, probe the wet wall for soft spots, and decide with you which fixtures stay and which ones go out.
We rebuild damaged framing, install the waterproof layer around the tub or shower, and run the fan duct to the outdoors before any wall closes.
We tile, set the vanity, toilet, and shower trim, then run water and the fan to confirm every connection stays dry and moves air.
A shower needs a continuous waterproof layer, and we choose between a sheet membrane and a liquid coat based on the wall and the floor pitch. The exhaust fan must vent outdoors, never into the attic, and its rating should match the size of the room. We confirm early whether your tub, toilet, or vanity stays, because moving a drain changes the plumbing scope and the inspection steps. Permit and code requirements for bathroom remodeling are checked before we order materials, so nothing waits on a surprise.
Straight tile lines, clean grout, a tight tub or shower surround, and fixtures that sit level where you chose them.
A sealed shower pan and waterproofed walls keep moisture from soaking into framing, where soft spots and stains start unseen.
Before any demolition, you decide which fixtures stay, which move, and whether the wet wall shifts, so pipes are not a surprise.
Demolition comes first, then wall repairs and waterproofing, then tile, then fixtures. Each step is finished before the next one covers it.
We walk the finished room with you, run the water, test the fan, and note anything that needs another look.
You can take long hot showers, because the fan clears steam and the surfaces are built to handle daily moisture.
A refresh keeps your tub and the wet wall, so it costs less and finishes fastest. A rebuild opens the walls to fix waterproofing and add a proper vent fan, which adds days but protects the framing. A full gut moves fixtures and plumbing, so it takes the longest and costs the most. Ask whether each fixture stays, because that one answer shapes your bathroom remodeling budget, upkeep, and schedule.
Jeff Kellner has spent more than four decades remodeling homes and offices, and he has held his license since 2004. That history guides how each bathroom job is run.
You approve a written scope before work starts. It lists the rooms, the materials, and the layout, and nothing is ordered until you sign that page.
The same crew that demolishes your bathroom on the first day is we that sets the last fixture and joins you for the final walkthrough.
If a mid-job change comes up, such as moving a drain or keeping a fixture you planned to replace, it gets written down and approved by you before anyone starts.
Ask for a visit and we will check the wet wall, decide whether your toilet and vanity stay, and plan the exhaust fan. You get a written plan for the bathroom remodeling before a single tile is ordered.