A casita or ADU is a separate dwelling, so the work starts with paperwork and a site plan. We help you sort out permits, property setbacks, and how water, power, and sewer lines reach the new space. Then we build the foundation, frame, and interior as a complete home with its own entry, kitchen, and bath. This is new construction, not a room refresh.
You may notice the trouble before a single stake goes in. A permit office asks for drawings you do not have. The yard seems too tight once you picture the required setbacks. Nobody can say where the water, sewer, and power lines would connect. Relatives need their own space, but a room addition would not give them a front door or a kitchen. Each problem points to casitas & adu construction, planned as a separate dwelling.
We measure the lot, mark property lines, and confirm how far the new dwelling must sit from each boundary. Water, sewer, and power routes get mapped on that plan.
After the permit set is approved, crews dig, set forms, and pour the footing and slab. Trenches for the separate utility lines open before the floor closes.
Walls and roof go up, then plumbing, wiring, and the kitchen and bath get connected. The inspector signs off before finishes cover the walls.
A separate dwelling needs its own foundation, framing, and weather barrier, built to the same code as any new home. Utility lines are trenched and connected to the main service, and each trench is inspected before it is covered. Setbacks decide where the footprint can sit, so we check the survey before the first footing is dug. Egress windows, smoke alarms, and a full kitchen or bath all follow code, and your inspector signs off at each stage.
You end with a finished, self-contained space that has its own entry, its own living area, and its own working utility connections.
Checking setbacks, easements, and utility routes first prevents redrawn plans and stalled approvals that can freeze a backyard build for months.
Before any demolition or digging, we settle the footprint, the trench routes, the permit set, and where the structure sits against your property lines.
Approvals come first, then the foundation, then framing and rough utilities, then interior finishes. Each step passes inspection before the next one begins.
We walk the finished space beside you, run every fixture and outlet, and write down anything that needs adjusting before we close out the job.
Once the final inspection clears, the building is ready for a relative, a visitor, a renter, or a quiet home office.
A new detached casita costs the most and takes longest, since it needs its own foundation, utility trenches, and setback approval, but it gives the most privacy. Converting a garage usually moves faster because the walls and slab already exist, though the permit review still checks egress, insulation, and parking. An attached unit shares one wall and some systems with your house, which can trim cost and keep upkeep simple. Each choice is a separate dwelling, so each needs its own permit.
Jeff Kellner has held his license since 2004, after four decades of remodeling homes and offices. That background guides how we handle permits, utilities, and setbacks on every casita.
Before any digging starts, you receive a written scope covering permits, utility connections, setbacks, and finishes. You read the page, ask questions, and approve the work before work begins.
The same crew stays with your separate dwelling from the first day on the lot to the final walkthrough, so nobody has to relearn your plans.
If you want a different window or a utility line has to move, the change is written down and approved by you first. Nothing shifts on the site before that.
Call to schedule a visit where we look at your property lines, the setbacks that limit where a second dwelling can sit, and the utility routes it needs. You will leave with a clear picture of casitas and ADU construction on your lot.