Casitas & ADU Construction

A Second Home Built Behind Your House

Permits, utilities, and setbacks settled before digging begins

A casita or ADU is a separate dwelling, so the work starts with paperwork and a site plan. We help you sort out permits, property setbacks, and how water, power, and sewer lines reach the new space. Then we build the foundation, frame, and interior as a complete home with its own entry, kitchen, and bath. This is new construction, not a room refresh.

Signs a Backyard Dwelling Needs Real Planning First

Problems That Surface Before Any Digging

You may notice the trouble before a single stake goes in. A permit office asks for drawings you do not have. The yard seems too tight once you picture the required setbacks. Nobody can say where the water, sewer, and power lines would connect. Relatives need their own space, but a room addition would not give them a front door or a kitchen. Each problem points to casitas & adu construction, planned as a separate dwelling.

Steps That Turn Open Lot Into Home

Approvals and utility work come before framing

Measure Lot and Confirm Setbacks

We measure the lot, mark property lines, and confirm how far the new dwelling must sit from each boundary. Water, sewer, and power routes get mapped on that plan.

Paperwork and ground work come first, because a separate dwelling needs approved plans before anyone drives a stake.

Submit Permits, Then Pour Foundation

After the permit set is approved, crews dig, set forms, and pour the footing and slab. Trenches for the separate utility lines open before the floor closes.

Next, approved plans become a foundation, a frame, and utility lines that serve only the new home.

Frame, Connect, and Pass Inspection

Walls and roof go up, then plumbing, wiring, and the kitchen and bath get connected. The inspector signs off before finishes cover the walls.

You end up with a finished home of its own, and we walk each room and system with you before we call it done.

Foundations, Utilities, and Code Steps for a Separate Dwelling

How the Structure Gets Built and Connected

A separate dwelling needs its own foundation, framing, and weather barrier, built to the same code as any new home. Utility lines are trenched and connected to the main service, and each trench is inspected before it is covered. Setbacks decide where the footprint can sit, so we check the survey before the first footing is dug. Egress windows, smoke alarms, and a full kitchen or bath all follow code, and your inspector signs off at each stage.

Six Outcomes of Building a Second Dwelling

Each result comes from planning the lot before any digging

A Dwelling Ready to Occupy

You end with a finished, self-contained space that has its own entry, its own living area, and its own working utility connections.

Fewer Failed Inspections

Checking setbacks, easements, and utility routes first prevents redrawn plans and stalled approvals that can freeze a backyard build for months.

Site Choices Made First

Before any demolition or digging, we settle the footprint, the trench routes, the permit set, and where the structure sits against your property lines.

Approvals, Foundation, Frame, Finish

Approvals come first, then the foundation, then framing and rough utilities, then interior finishes. Each step passes inspection before the next one begins.

Final Walkthrough With You

We walk the finished space beside you, run every fixture and outlet, and write down anything that needs adjusting before we close out the job.

Space for Family or Guests

Once the final inspection clears, the building is ready for a relative, a visitor, a renter, or a quiet home office.

Detached Casita, Garage Conversion, or Attached ADU: Weighing Each Build

Cost, Upkeep, and Timeline Tradeoffs Compared

A new detached casita costs the most and takes longest, since it needs its own foundation, utility trenches, and setback approval, but it gives the most privacy. Converting a garage usually moves faster because the walls and slab already exist, though the permit review still checks egress, insulation, and parking. An attached unit shares one wall and some systems with your house, which can trim cost and keep upkeep simple. Each choice is a separate dwelling, so each needs its own permit.

Kellner Construction LLC Backs Your Casita From Permit to Walkthrough

Clear terms for a separate dwelling built on your lot

Licensed Since 2004

Jeff Kellner has held his license since 2004, after four decades of remodeling homes and offices. That background guides how we handle permits, utilities, and setbacks on every casita.

Written Scope Approved

Before any digging starts, you receive a written scope covering permits, utility connections, setbacks, and finishes. You read the page, ask questions, and approve the work before work begins.

The Same Crew

The same crew stays with your separate dwelling from the first day on the lot to the final walkthrough, so nobody has to relearn your plans.

Approved Before Anything Moves

If you want a different window or a utility line has to move, the change is written down and approved by you first. Nothing shifts on the site before that.

Frequently Asked Questions

What utility connections does a new ADU need before anyone can live in it?

A new ADU needs water, sewer, and electrical service that reach the new dwelling before anyone can live in it. Gas may be added if the plans call for it. We map where each line runs from the main house, then confirm the route and connection points before any trenching starts.
Setbacks decide where your casita can sit because they set the minimum distance between the new walls and each property line. Those distances also apply to the main house and any easements. We measure the lot, mark the buildable area, and place the footprint inside it before the plans are drawn.
An ADU can have its own kitchen, bathroom, and entrance, and that is what makes it a separate dwelling. A private entrance is common, and many plans add a small kitchen and full bath. We lay these out early so plumbing, electrical, and egress all work together.
You should expect a building permit for the structure, plus approvals for the plumbing, electrical, and site work tied to it. The exact list depends on your plans and the local building office. We prepare the drawings and paperwork with you so the application is complete when it goes in.
Inspections for a new casita or ADU happen in stages, starting with the foundation and moving through framing, rough utilities, and the final review. An inspector checks each stage before the next one starts. We schedule each visit, walk the work beforehand, and fix anything flagged so the build keeps moving.

Book a Visit to Review Your Lot, Permits, and Utility Connections

Call to schedule a visit where we look at your property lines, the setbacks that limit where a second dwelling can sit, and the utility routes it needs. You will leave with a clear picture of casitas and ADU construction on your lot.