Flooring Installation

Subfloor Checks Come Before Any New Surface

Door heights and transitions get settled early

Good flooring installation starts below the surface. We check the subfloor for soft spots, dips, and moisture, then repair or level it so the new surface lies flat. Next we measure door heights, because thicker planks or tile can make a door drag. Once the base and clearances are settled, we lay the floor you picked and finish the edges, trim, and thresholds.

Signs Your Floors Need Replacing, Not Another Patch

Problems Hiding Beneath the Surface

A board that bounces underfoot, a squeak near the hallway, or a corner that dips toward the wall often points to a weak subfloor rather than worn finish. Doors that scrape the new surface and thresholds that trip you signal height problems too. When boards cup, seams open, or planks lift, a patch only hides the cause. Flooring installation fixes the base first, then sets the right surface in place.

Three Steps From Bare Subfloor To Finished Floor

Every step follows the order the work happens

Test And Prepare The Subfloor

We walk the room, press on weak boards, and check for dips and damp areas. Repairs and leveling come first, because any flaw underneath will show through the new surface.

The first step decides how long the floor lasts, because the new surface only stays flat and quiet when the subfloor under it is sound and level.

Measure Door Heights And Transitions

New material adds thickness, so we check every door swing and the height where the floor meets the next room. Then we choose trim and thresholds that fit cleanly.

The second step protects how the room works day to day, since doors that scrape or thresholds that catch a foot are easy to prevent when we measure before any material goes down.

Lay The Surface And Finish

We lay the new surface in your chosen pattern, leaving the right gaps at the walls. Then we set the trim, clear the debris, and walk the room with you.

The last step is the walkthrough, where we cross the finished floor with you, point out each transition, and fix any detail that is not right before we leave.

Your Prep, Door Clearance, and Surface Rules That Matter

How Each Floor Type Gets Installed

Each surface has its own method. Tile needs a stiff, flat base. Hardwood needs a dry base and room to expand along the walls. Vinyl plank shows every bump underneath. We measure door heights before ordering, because new flooring raises the floor and doors may need trimming to swing freely. Transitions at thresholds are planned so the height change stays safe to walk across. Code and manufacturer instructions set the limits on flatness and moisture, and we follow them on every flooring installation.

Six Results Waiting Under Your New Floor

Each result starts with the subfloor and the door heights

A Flat, Even Finish

Every room ends with a flat, even surface that meets the walls cleanly and reads as one continuous floor.

No Squeaks or Gaps

Leveling the subfloor first stops squeaks, rocking boards, and open seams from showing up months after the new surface goes down.

Decisions Made Before Demolition

Before anything comes up, we confirm the surface, the layout direction, and how thick the new floor will sit against each door.

A Clear Order of Work

Old surface comes out, the subfloor gets repaired and prepped, then the new surface goes in and the trim returns last.

Checked Together, Room by Room

We walk each room with you, check seams and edges, and test every door swing before the job is closed.

Move Back In Confidently

Move furniture back, run the vacuum, and live on the new surface knowing the prep underneath was done to hold up.

Comparing Floor Surfaces by Cost, Upkeep, and Timeline

What Each Surface Means for You

Most homeowners choose between hardwood, luxury vinyl plank, tile, and carpet. Hardwood costs more and can be refinished, while vinyl plank installs fast and wipes clean. Tile takes the longest to set and cure, and carpet moves quickest. Each surface changes the finished floor height, so we measure door clearances first. We also check whether your subfloor needs leveling, because that step affects both budget and schedule.

Floors Built on Clear Terms and One Steady Crew

What you can count on from Kellner Construction LLC

Licensed Since 2004

Our license has been active since 2004. The people who walk the job and the people who build it work under that license.

Written Scope Approved

Before any work begins, you receive a written scope covering the subfloor repairs, the door heights, and the surface going in.

Same Crew

The same crew stays on the job from the first day of demolition through the final walkthrough, so the plan does not have to be explained again.

Changes Approved First

If the job changes midway, say a soft subfloor patch or a new threshold height, we write the change down and wait for your approval before anything moves forward.

Frequently Asked Questions

How do you prepare a subfloor before the new floor goes down?

We prepare the subfloor by checking it for movement, low spots, and dampness, then correcting what we find. Loose panels get fastened down, and dips get leveled with the right patching material. A flat, dry base keeps the new floor from squeaking, gapping, or lifting as seasons change.
New flooring can make doors drag when the finished surface sits higher than the old one. We measure door heights before ordering, so we know how much clearance each door has. If a door will rub, we trim the bottom edge or adjust the plan before the surface is installed.
A busy kitchen usually does best with a surface that resists scratches, spills, and daily wear. Tile, luxury vinyl, and some engineered wood all fit that need in different ways. We compare each option with you against your habits, the subfloor underneath, and how the floor will meet the rooms beside it.
Sometimes new flooring can go over the old floor, but only when the old surface is flat, firm, and dry. We test it first before we decide. Extra layers also raise the floor height, which affects doors and transitions, so removal is often the cleaner choice for a lasting result.
You should wait until the installer says the floor is ready, because adhesives, grout, and finishes cure at different speeds. We give you a clear timeline for your chosen surface. Light foot traffic often comes first, while heavy furniture waits longer so dents, shifting, and surface damage do not appear.

Ask About Your Subfloor, Door Heights, and Floor Surface Before Ordering

Call Kellner Construction LLC to talk through your flooring installation. Tell us what lies under the old floor, how much clearance your doors have, and which surface you want. We will answer your questions and book a visit to measure.